Skip to content

How we work

The same company from site survey to support

The company that develops and manufactures the system is the one that installs it, trains your team and supports it afterwards. You know what you are buying and who to talk to.

  1. Step 01

    Site survey

    We visit or remotely survey the facility: silos, existing cables, equipment, current controls, team routine, the problem experienced and the installation window. This is where we confirm whether the Maass solution is a fit.

  2. Step 02

    Proposal and scope

    We present the recommendation and how it works, with scope and exclusions, each party’s responsibilities, installation, testing, training and terms. Anything reused from the existing structure is made clear.

  3. Step 03

    Manufacturing

    Software, panels and components are developed and assembled by Maass itself, with bench testing before going to the facility.

  4. Step 04

    Installation and integration

    Our team installs and integrates the system with the customer’s equipment and structure, coordinating interfaces with other suppliers when needed.

  5. Step 05

    Testing and training

    We validate operation with the facility running and train the operator, the manager and anyone else who will follow the system.

  6. Step 06

    Support

    After delivery, the customer has a direct support channel with Maass for the systems we supplied, according to the terms of supply.

What the proposal makes clear

No surprises about what you are buying

Scope and exclusions

What is and is not included in the supply.

Responsibilities

What is up to Maass and what is up to the customer.

Installation

Lead time, window, testing and training.

Support

How and where you are served afterwards.

Take control

Shall we assess your facility?

Tell us how your facility works today. A Maass specialist will understand the situation and suggest the next step: a demo, a site survey or a proposal.